Residential Microgrid
Why the solar on your roof goes dark when the grid does.
Most solar installations in Southern California shut themselves off during an outage, by design and by rule. Inside a residential microgrid, the roof keeps working. The difference is the inverter, the battery and the electrical design.
The roof in a shutoff
Solar is a source only when the house is designed to let it be one.
The most common surprise in the first shutoff is that the house with solar panels is as dark as the house next door. That is not a defect. A standard grid-tied solar inverter is required to stop producing the moment it loses the utility, so that it never pushes power into a line a utility crew believes is dead. The panels are fine, the sun is out, and the inverter is sitting in its mandated safe state. Unless the house has a battery and an inverter capable of forming its own grid behind an islanding device, solar contributes nothing to an outage.
Inside a residential microgrid the roof has a job. When the gateway or transfer device islands the house, a battery inverter that can grid-form provides the reference the solar inverter needs to keep operating, and the solar recharges the battery through the daylight hours of a shutoff that runs for days. The generator then carries the heavy loads and the nights, the battery carries the quiet hours, and the roof refills the battery each morning. On a long shutoff that combination uses a fraction of the generator fuel a generator-only house burns, which matters on propane in Malibu and Topanga, where the tank is the limit.
The electrical design has to make the sources agree. A solar inverter, a battery inverter and a generator each think they are in charge of voltage and frequency, and only one can be. In a well-designed system the battery inverter forms the island, the solar follows it, and the generator is brought in as a source the battery inverter manages, with the solar held back or shed when the generator is running if the equipment requires it. Those are settings, interlocks and sometimes specific hardware, and they are the reason County Line treats a house with existing solar as a design problem rather than a generator sale. The existing solar is surveyed first: inverter model, capacity, how it is interconnected, whether it can be integrated or has to be isolated behind the transfer switch.
There is also the economic side, which has changed. Under California's current net billing rules, exported solar is credited at far less than it once was, and the equipment that makes solar useful in a shutoff, a battery, is also the equipment that makes it useful on an ordinary evening by storing the afternoon's production for the night. A homeowner designing a residential microgrid for the outages often finds that the battery pays its way on the weekday bills too. County Line does the electrical side of that; the tariff decision belongs with the owner and the utility.
What solar does not do: it does not carry a house at night, it does not start a well pump on its own, and it does not run in a shutoff without a battery and the right inverter. A solar company that promised backup without a battery has promised something the equipment cannot deliver. The honest page in this series says when solar should stay a bill-reduction investment and nothing more.
Back to the overview: Residential Microgrid.

Questions
Will my solar panels work during a power outage?
No, usually not. A standard grid-tied solar inverter is required to shut down when the utility goes down. Solar keeps producing in an outage only when the house has a battery with a grid-forming inverter and an islanding device, which is what a residential microgrid design provides.
Can I add backup to solar I already have?
Often, after a survey of the existing inverter and interconnection. Some systems integrate with a battery and gateway; others are isolated behind the transfer switch and the backup is designed around them. County Line looks at the existing equipment before proposing anything.
Official references
Where the facts on this page come from.
County Line links to the authorities rather than restating them. Rules change; these pages are current.
- California Public Utilities Commission: shutoff rules and the interconnection framework
- SCE Rule 21 interconnection: what the utility requires of equipment that can export
- SCE Public Safety Power Shutoffs: the outages a solar-plus-storage design is for
The series
One question at a time.
One question at a time: each page in the residential microgrid series answers a single part of the design.
- Designed for the shutoffsThe outage is the design brief
- Generator and battery togetherWho carries what, and when
- Bidirectional EV chargingThe car as the battery
- Smart panels and load managementDeciding what stays on
- The all-electric houseTitle 24 and the service size
- Canyon and coast homesPropane, wells, gates, days
- Permits and the utilityInterconnection and inspection
- Keeping it readyA system that is never tested fails
- When it is too muchThe honest page
Next step
Tell us what has to stay on.
Tell us what has to stay on when the grid is off: the well, the gate, the kitchen, the chargers, with your name, phone and city. Jeff walks the panel and the yard, then the design conversation starts.
Or call (805) 499-0823. Monday to Friday, 9 to 5.